Saturday was demo, Monday was electrical, and last night I got everything plumbed and tested. My boss wife was REALLY pressing for it to be done last night, so I made it happen. In fact, we finished at 12:30 AM, almost ready to strangle each other, but our moods changed instantly when it turned on and worked. I estimate we put about 16 hours of work into the whole thing with demo, wiring, plumbing, and a bazillion Home Depot trips. The air gap hole alone took an hour to drill through the granite.
All that's left is to make it nice looking with some 1" trim around the edges and re-tiling the floor. Hi five to us!
Check out some of the most exciting footage you will ever see.
No comments:
Post a Comment